(Archived document, may contain errors)
482 January 23, 1986 THE c II i MILITARY AIRLIFT GAP
INTRODUCTION Should a crisis develop in Europe or the Mideast, it
would take the U.S. 483 C-5 and 1,558 C-141B cargo plane loads to
rush the 24th Mechanized Infantry Division-with its 16,800 troops,
290 tanks, 430 armored fighting vehicles, 124 helicopters, 780
combat support vehicle s, 3,580 trucks and other equipment-from its
base in Fort Stewart, Georgia, to the trouble spot within the
prescribed ten days.
To support Europe alone, the U.S. would have to transport six
such Army divisions 60 tactical fighter squadrons, and one Marine
Amphibious Brigade to Western Europe.
In the event of such demands, the U.S. does not have enough
cargo planes to speed its forces to distant battlefields. This
strategic airlift gap is one of the American arsenal's most serious
weaknesses.
That the U.S. needs more airlift capability is widely accepted.
At issue, however, is whether the Air Force's $39.8 billion Airlift
Master Plan is the best way to close the gap. By designating a new
generation of cargo airplane,.the McDonnell Douglas C-17, as the
Plan ' s centerpiece, the Pentagon may be making a serious and
costly error The Air Force Plan suffers from two fundamental flaws:
1) it underutilizes aircraft already in the airlift fleet as well
as such and at a significantly lower acquisition cost than the C-
17's $180 million each; 2) it rests on questionable operational and
planning assumptions, such as using the C-17 for both tactical and
strategic airlift missions.
Careful analysis by experts of U.S. airlift needs and of the
C-17 program reveals that a new cargo plane is not needed to close
the gap. As such, the Air Force should cancel the C-17, now in a
proposed planes as the Lockheed C-5B, which could be produced s
ooner i Ifull-scale engineering-phase of development, and instead,
build more C-5B cargo and KC-10 cargo tanker aircraft. Better use,
moreover should be made of the existing fleet of 2-130 and C-141B
Starlifterll strategic.aircraft. Not only could this sa ve about
$20 billion, but the U.S. would have the needed planes available
much sooner.
STRATEGIC AIRLIFT AND U.S. MOBILITY REQUIREMENTS Strategic
airlift is used primarily for the rapid deployment of forces,
military equipment, and supplies to combat zones in the early
stages of wars. Without the prepositioned military equipment that
exists, for example, in Europe and Korea, most U.S. military
contingencies in the Third World would require rapid air transport
of men and materiel to the combat zone indispen s able for
sustaining combat an average 30 days or longer, but it is often too
slow to reach the combat zone for violent regional conflicts
decided very quickly Transport by sea is The standard categories of
airlift military cargoes are: 1 bulk, such as fue l , ammunition,
and other cargo that when loaded on pallets can be carried by most
airlifters; 2) oversize, such as trucks and towed artillery pieces
that fit into all military cargo planes (C-5, C-141, C-130, and
KC-10) and some specially designed civilian aircraft; and 3)
outsize, such as main battle tanks helicopters, and other
extremely'large items that can be placed only in the huge C-5 or
the proposed C-17 cargo planes.
The principal aircraft in the Air Force's airlift fleet are its
70 C-5 t'GalaxyI1 a nd 234 C-141 llStarlifter" strategic
airlifters, 16 KC-10 dual-capable cargo/tanker aircraft, and 512
C-130 INHercules1 tactical airlifters. The C-5A jet and its newer
modified version, the C-5B, carry outsize cargo such as tanks and
helicopters over inte r continental distances. The C-141, the
workhorse strategic airlifter of the Military Airlift Command,
carries a substantial volume of cargo over unlimited ranges with
in-flight refueling prop-jet C-130, on the other hand, is the
mainstay of the tactical ai r lift fleet, operating within combat
theaters and carrying troops and cargo 100 to 2,000 miles
helicopters and fighter planes, perform as an aerial gunship,
airborne command post, or airmobile communication center. The KC-10
is essentially the three-engine McDonnell Douglas DC-10 long-range
aircraft capable of carrying cargo and refueling other aircra.ft
The When modified, it can refuel 1. Information provided 'by U.S.
Air Force, Military Airlift Command 2- I SHORTFALLS IN STRATEGIC
AIRLIFT In the late 1970 8 , the possibility that the U.S. would
have to defend its interests in the Persian Gulf renewed interest
in strategic mobility. mobility requtrements led to the
Congressionally Mandated Mobility Study CMMS In 1981, the study
concluded that the U.S. was woe fully short of cargo planes, ships,
and military equipment prepositioned abroad airlift 66
million-ton-miles-per-day (MTM/D) to meet its glopal commitments.
Currently, the U.S. has a 43 MTM/D capability.
Joint Chiefs of Staff concluded that a 150 MTM/D air lift
capability would be desirable just for reinforcing U.S. troops in
Europe A congressional request that the Pentagon review strategic
The study recommended that the U.S. be able to Even this vastly
underestimates U.S. requirements In 1980, the Simultan eous wars in
Europe and the Persian Gulf, or Europe and Korea, are thus far
beyond U.S. airlift capabilities. Even the CMMS goal of 66 MTM/D,
which will not be mft until the late 199Os, is the absolute minimum
of what is required.
THE AIR FORCE AIRLIFT MAS TER PLAN Even before the CMMS was
completed, the Air Force developed plans for a totally new
long-range or strategic cargo plane to supplement the 1960s vintage
C-5 and replace C-141s and C-130s. The capabilities of the C-X, as
the glesign model was calle d , were determined before the CMMS was
completed plane to have both intercontinental range and the
Itmission The Air Force Airlift Master Plan required a 2. Final
Rebort Congressionally Mandated Mobility Study, Department of
Defense, May 1981 3. U.S. A ir Force Airlift Master Plan
(Washington, D.C U.S. Air Force, 1983 p 111-
5. The million-ton-miles-per-day (MTM/D) standard measure of
capability combines the amount of cargo moved (tons the distance to
be moved (miles and the time within which the movement i s to be
completed (days A follow-on study, Saber Challenge Lift recommended
that at least half of the recommended 20 MTM/D additional airlift
capability be for outsize cargo such as tanks and helicopters. The
study recommended, moreover, that fast sealift capabilities be
improved, u 4. Airlift Master Plan, p 111-5 5. U.S. General
Accounting Office The Department of Defense Should Resolve Certain
Issues concerning the C-X Aircraft before Requesting Proposals from
Industry for Its Full-scale Engineering Deve l opment (PSAD-8 1 -B
Washington, D.C., October 10, 1980 3flexibilityfifi to land at
small, hard-to-land-on airfields in.or near combat zones. Proposed
al/rlift characteristics included 'short landing and departure
approaches for tactical operations and the capability to convert
back and forth between cargo, troop, and aeromedical evacuation
configurations refueling and of carrying such outsize cargo as
tanks and helicopters. The C-X, therefore, was to be a hybrid cargo
lifter.
Its mission was to be a cross between intercontinental and
intratheater tasks traditionally accomplished by two different
airplanes The new plane should be capable of aerial In 1983 the Air
Force concluded that the C-17 would meet these requirements. The
following year, in the Airlift Master Plan, and the Airlift Total
Force Plan, the Air Force decided to:6 1) Build a strategic airlift
force to meet the Congressionally Mandated Mobility Study goal of
66 million-ton-miles-per-day airlift capability 2) Double tactical
airlift capability 3 ) Buy 210 C-178, using 30 for training and
backup 4) Retire 180 C-130 fifiHerculesfifi short-range tactical
airlifters 5) Retire 54 C-141 fifiStarlifterfifi long-range cargo
planes and transfer the remaining 180 Starlifters to the reserves
where their use rate and wartime capability will be lower 6) Use
C-17 short-range or fifiintratheaterfifi shuttles to replace the
retired C-130.planes and to augment tactical airlift capability by
almost 80 percent.
Before the Air Force issued the Airlift Master Plan, th e
Department of Defense already had decided to increase airlift
capability in the near term buying an additional 50 C-~BS, 44 KC-10
fupl tanker aircraft, and 19 converted Boeing 747s for troop
transport. The principal reason that these aircraft were bough t
was that they would be available significantly earlier than the
C-17 Its plan of January 1982 called for 6. See Airlift Master
Plan, pp. V-8-9 7. The C-5B is a modified version of the C-5A.
Modifications include a new engine (the General Electric TF-39-1 C
new wings, modernized avionics, and a fuselage structure
constructed from an aluminum alloy less conducive to corrosion 4-
Air Force Plans Aircraft Number Onerational to Meet Airlift Goals
c-5 70 Purchase 50 C-5Bs C-141 234 Retire
54. Move 180 tu reserv es at one-half current operating rate
C-130 512 Retire 180 C-17 Purchase 210 KC-10 16* Purchase 44 CRAF
Wide Body Cargo 39 Modify 19 747s 16 KC-10s assigned to Strategic
Air Command 44 additional KC-10s to be added to Strategic Air
Command fleet but dedic ated to airlift use Civilian Reserve Air
Fleet for transporting cargo on modified passenger planes in times
of national emergency.
Source: Military Airlift Command, United States Air Force.
The Air Force claims that the C-17 program is the most
economical option it examined states: "The acquisition of 210 C-17s
would-cost $16 billion less and require nearly 15,000 fewer
personnel to operate when compared to alternatives based on the C-5
that provide equivalent capability.
The savings will come from the lower manpower and operational
costs of the C-
17. Savings will also accrue from the retirement of 180 C-130s
and from transferring 180 C-141Bs into the reserves at a lower
operating level, which will cut down on active duty manpower and
operational costs A ssistant Secretary of the Air Force Tom Cooper
b 8. Hearings, Subcommittee on Sea Power and Force Projection, U.S.
Senate, March 7, 1985 5 PROBLEMS WITH THE AIRLIFT MASTER PLAN The
Air Force should be applauded for trying to come to terms with the
perenni al problem of airlift shortfalls going about it raises
serious questions.
But its way of Among them 1 Is a.new ueneration strateuic
airlifter necessarv? Under Air Force plans, the C-5 air cargo plane
will remain in service along with the C-17 well beyond the year
20
00. Is there really a need for a new strategic airlifter if the
current model, the C-5B, has.enough productive years left to be
retained in the inventory for that long a period 2) The
dual-caBabi1itv dilemma: A key element.of the Air Force plan is the
capability of the C-17 to deliver troops, supplies, and military
equipment not only over vast distances but directly to combat
forces at the forward edge of the battlefield. This will be
essential mainly because the Air Force plan w ould retire 180.C-130
Hercules from the fleet of 512 tactical airlift aircraft. The C-17
is supposed to fly tactical air sorties between strategic airlift
missions.
In a major war, however, it is questionable whether the new and
expensive C-17 will be available for tactical combat support
roles.
Presumably, it will be flying intercontinental sorties across
the Pacific or North Atlantic. Even if the plane were available,
some experts see problems with a hybrid design that equips.the C-17
for both strategic and tactical airlift missions 3) Battlefield
vulnerabilities Is it realistic to expect the Air Force to risk the
C-17, which may cost $180 million or more each on Ilausterell
airfields in or near combat zones? Former Air Force Secretary
Vernon Orr apparen t ly does not think so. As he said in 1982,
ll...my worry...is that with a very large expensive plane like the
C-17 and a limited number of them, the forward commander may not
want to order them up to the edge of the battle area This problem
of the vulnerab i lity of a large, expensive, and valuable
strategic carrier plagued the 1983 U.S. military operation in
Grenada. Explaining why air cargo sorties were backed up, Colonel
Dave Starling, now a commander of the Amyls 18th Airborne Corps
Support Command, said: "Initially there was concern that the
[cargo] aircraft was susceptible to gunfire and, if one got hit,
weld have really been up a creek. IIAircraft were stacked up. to
the ionosphere 9. Militarv Technoloev, Interview, August 1982, p.
87 10. Militarv Logis t ics Forum, July/August 1985, p. 23 6-c
another commander said, who added that lift operations might have
been term'inated had the enemy had longer range anti-aircraft guns
4) Cost: The estimated acquisition cost for the Airlift Master Plan
is $39.8 billio n, of which $37.2 billion is for the C-
17. In its own terms, the C-17'~ price may be reasonable for the
research development, and production of a plane using the latest
aviation technology. But whether this plane is reasonable for the
allotted task is ano ther matter. To be sure, the Air Force claims
that its plan will be $16 billion less than alternatives based on
the.C-
5. Yet by some calculations, adding 101 C-5Bs to the fleet to
meet the Pentagon's goab of 66 MTM/D airlift capability would cost
at most 16.8 billion. And this is at an inflated Ilthen-yearll
dollar cost computed to reflect price hikes during the aircraft's
production life. Yet this is still far below the then-year $37.2
billion acquisition cost for the C-
17. Anticipated economies in producing a plane that has been in
production for some time, moreover, could reduce the total
acquisition cost of 101 C-5Bs to $14 billion.
Greater savings will come from,not retiring the C-141s and
C-130s as required by'the Air Force Plan. While it is true that the
C-141s will have to be replaced some day, their service life can be
extended to help meet strategic airlift requirements at a lower
cost until 1998..In this time, the Air Force can develop and deploy
a follow-on tactical airlifter to replace the C -130 By extending
the service life of the Inwork horsell C-141B at a cost of about
300 million, the Air Force could keep 180 of these aircraft in
active stagus, and not, as is currently planned, transfer them to
the reserves may be considerably lower, but readiness is also.
Cost there The savings from building more C-5Bs instead of C-17s
will enable the- Air Force to keep the C-130 in operation aircraft
currently marked for retirement could be kept in service until a
new short-range tactical airlifter is d eveloped and produced.
Keeping the C-130 in the air would safeguard the Air Force's
tactical The 180 of these 11. Ibi 12. This figure is based on a
Lockheed fixed unit price proposalof around $100 million a copy (in
1984 dollars which includes Air Force a dd-on costs. The total
then-year cost is derived from a Selective Acquisition Report
estimate of $8.4 billion for 50 C-5Bs in then-year dollars. This
puts the unit cost of a C-5B at $168 million for a program funded
over the FY 1983-FY 1987 period. Adjust ing for lower expected
inflation results in an estimated then-year cost of $155 million a
copy for the C-5B, which compares favorably with $180 million a
unit for the C-
17. Selective Acauisition ReDort, Department of Defense,
September 30, 1985 13. Inform ation provided by Lockheed
Corporation. It includes cost of extending service life of C-141
from 45,000 hours to 60,000 hours 7-airlift mission. It would.
ensure that there are enough short-range airlifters to perform the
many tactical airlift' missions f or.which an expensive and
essential strategic airlift cargo plane like the C-i7 may either be
unavailable or overqualified.
Many experts argue in fact, that a new tactical'airlifter to
replace the C-130 is needed far more than a new long-range air
cargo plane like the C-
17. Said Lt. General William Richardson, former Army Deputy
Chief of Staff for Operations and Plans: "The C-17 is not the
Isolutionl--there will always be a need for a smaller, STOL (short
take-off and landing) aircraft that is technologic ally superior to
the C-13 0 I1 It is true that the C-17, with a minimum crew size of
three and low maintenance personnel requirements, will demand less
manpower than the C-5B, which has a minimum crew size of seven or
eight. Decreasing manpower adds to sa v ings The Air Force claims
that the C-17 option will require 15,000 fewer personnel than the
C-5 option. This accounts for some of the alleged savings of the
C-17 approach savings comes not from C-17 operating and manpower
economies but from the cut in mai n tenance, operations, and
manpower costs if the C-141s and C-130s are retired. It makes
little economic sense, however to purchase a new type of aircraft
.to replace old ones when much of the existing fleet is still
capable of longer service at a relativel y low cost But the major
portion of the Air Force projections for C-17 THE e-5 vs THE C-17
TECHNICAL ISSUES There are a number of technical issues involving
the relative merits of the C-17 or C-5 option. Among them 1) Desiun
and ORerational Concer)ts: Some critics of the C-17 argue that the
design and operational concepts for the C-17 and C-5 are remarkably
similar. The C-17 probably has a capability advantage at the
tactical airlift end of the nission spectrum, while the C-5 has the
advantage at the strate g ic end 14. "Army Operations Chief Says
He's Tired of USAF's C-17 Defense Week, February 14 1983, p. 3 15.
For a more complete comparison, see Jeffrey Record Reauirements and
Caoab 'ilities (Cambridge, Massachusettsyid Washington, D.C
Institute of Foreign P olicy Analysis, 1985), Appendix B Stratepic
Airlift 8 I C 2) Availabilitv of Airfields: The C;5B requires
runways 4,000 feet long and 150 feet wide for landing. But Lockheed
Corporation the manufacturer of the C-5B, claims that recent tests
of the wing-mo d ified C-5A demonstrate the abilityl,of the C-5A
and C-5B to land on runways only 3,000 feet in length. The design
requirement for the C-17, on the other hand, is the gapability to
land on runways 90 feet wide and as short as 3,000 feet. Even if
the C-5B s till needs 4,000 feet to land, operationally it barely
will be at a disadvantage compared to the C-
17. The reason: only a tiny fraction of airfields in Europe,
Northeast Asia (Korea and Japan), and Southwest Asia are between
3,000 anfi 4,000 feet long and thus can accommodate the C-17 but
not the C-
5. In Central America, however three-quarters of all airfields
are shorter than 3,000 feet and thus can handle neither the C-17
g,or the C-5B. This is the case in many other Third World
countries. I 3) Airfield Conaestion and Obstacles: A major Air
Force argument for the C-17 is that because it is smaller t h an
C-5B, it is less likely to cause congestion at airfields during
operations is undoubtedly true than the C-17 (261,000 lbs. vs.
172,200 lbs fewer C-5Bs than C-17s will be needed to aeliver the
same load, thus decreasing congestion front and rear loading doors
allow them to move in and out of the airports quickly.
It is argued that trees, fences, and other obstacles at the
periphery of some narrow airfields in Europe can hinder C-5B access
because of its broad wingspan (228 feet compared to 165 feet for t
he C-17 and 195 feet for a Boeing 747 commercial jet however, can
be removed quickly. Preparing European airfields, and when
necessary, non-European allied airfields, for better use by the
C-5B is no major undertaking This Yet because the larger C-5B deli
v ers more cargo Backups are cut even further by the C-5s because
their Trees and fences 16. Ibid, p 44. Information also provided by
U.S. Air Force, Military Airlift Command, Scott Air Force Base 17.
Record, QLL cit. p 29. Lockheed Corporation claims that t he C-5
can operate on dirt runways as well 18. Air Force, Military Airlift
Command I i 19. Record, OD. tit. pp. 29-30 20. As for the C-5Bs
wider runway requirement, it would be more cost effective to widen
runways by pouring more concrete or laying metal p lanks to handle
the C-5Bs 150 feet runway width requirement than to buy the C-17 9-
RECOMMENDATIONS AND PROPOSALS The Gramm-Rudman-Hollings budget
balancing bill is going to force careful examination of all
federalspending an airlift-enhancement program t h at can be sold
to Congress as cost effective and close the airlift gap could be
jeopardized airlift-enhancement proposals should be constructed to
get the most military capability for the money spent be to
establish the strategic and military operational p riorities for
the program, and then to find the most economical way to meet these
priorities The Air Force'thus needs If the program cannot be sold,
the entire effort to narrow The guiding principle should I All I I
To do so, the Air Force should 1) Retai n the Congressi-onally
Mandated Mobility Study goal of 66 million-ton-miles-per day of
airlift requirements consensus behind this number future, but the
66 MTM/D goal appears adequate for the purposes of an affordable
airlift program There is a broad More c apability may be needed in
the 2) Cancel the C-17 program, build more C-5Bs and KC-lOs, and
retire no C-130s 3) Retire and transfer no C-141s. Keep all 234 of
them in the active force by modifying them to extend their service
life. The entire C-141B fleet of 271 airplanes can be extended 15
years for about $300 million 4) Consider developing a new
short-range "tactical" airlifter to replace the C-1
30. The Air Force will know more about this need after the
completion sometime this fall of the Pentagon's Wo rldwide
Intratheater Mobility Study (WIMS which Rill include an analysis of
future U.S. tactical airlift requirements. Because the U.S. needs a
robust tactical airlift capability the current force of over 512
C-130s should be kept in place until a follow- on tactical airlift
is deployed to take its place. To do so, a service life extension
program will be required for the C-130.
For the United States, whose militaw oblhations are spread
across thousands of miles, the ability to- fly tsoops, supplik and
mili tary equipmeat over great distances is absolutely
indispensable to its global strategy. The U.S. now suffers from an
airlift gap--and it 21. The fact that no current or planned
strategic airlifter can operate on three-quarters of the airfields
in Central A merica is a powerful argument in favor of developing a
new tactical airlifter which can 10 must be closed. Yet the Air
Force's proposed new'generation cargo plane, the C-17, and the
Airlift Master Plan are not the way to proceed. while moving
rapidly to b egin the development of a new generation short-range
tactical airlifter TheAdministration should buy more C-5Bs instead
of C-178 Kim R. Holmes, Ph.D.
Policy Analyst 11 I No. The Heritage Foundation 214
Massachusetts Avenue N.E. Washington, D.C; 20002 (202) 546-4400
Note: Nothing written here is to be construed as necessarily
reflecting the views of The Heritage Foundation or as an attempt to
aid or hinder the passage of any bill before Congress.